Script Building – Featherstone St.

Completed – April 2022

Location – Script Building, 1st floor, 44, Featherstone street, London, EC1Y-8RN

Main Contractor – Thirdway Int

Our Scope

  • New 120mm thick double skin partitions, from floor to soffit, 25mm insulation, taped and jointed, left ready for decorations.
  • Supply and fit new 100mm x 12mm paint-grade MDF skirting, primed, surface fixed to new partitions.
  • Bulkheads above new single glazed partitions and doorsets, tape and jointed, left ready for decorations.
  • New single glazed partitions, 12.8mm acoustic glass, dry jointed, standard colour channels, non-fire rated.
  • Supply and fit plant on ‘crittall’ banding detail applied to new glazed partitions, 1 x horizontal + vertical bands.
  • New ‘framed’ single glass door (single glazed), 33dB, with bottom drop seal, in aluminium door frame, complete with SSS lever handles, overhead door closer and floor door stop.
  • New Laminated doors, 838mm wide, within paint-grade door frame, complete with SSS lever handles, latch, and floor door stop, non-fire rated.
  • Anodised Bronze Guardsman pull handle 900mm centres/1000mm overall 19mm dia back to back

Share this

The Folgate Building

The Folgate Building

The Folgate Building. 10 Norton Folgate, E1 6DB
Main Contractor: Unispace
Completed: 27/06/2025

100 Pall Mall

100 Pall Mall

Location Pall Mall
Main Contractor: Unispace
Completed: March 2024

Financial Sector

London – Financial Sector
Main Contractor – Overbury
Completed – Summer 2022